Kaipu Testing secures 3.34 million yuan wind power grid testing contract in Sichuan
Kaipu Testing (开普检测) announced on September 20 that it won a bid and signed a 3.34 million yuan ($460,000) contract with Sichuan Nengtou Meigu Wind Power Development Co., Ltd. for grid-connection testing services at the Liangshan Meigu Siji Ji Phase II and Shama Naituo Phase II wind power projects in Sichuan. The 184-day contract represents 1.35% of Kaipu Testing's 2025 audited revenue. The company expects a limited impact on its 2026 performance.
Editorial responsibility
- No named human review is recorded for this page.
- Reports are grouped by semantic similarity and deterministic rules. Language models may assist titles, summaries, translation and cross-source analysis; the page reads the event directly, while its address stays stable when the title changes.
- Summary covers the current reports
Cross-source coverage
Reporting timeline
Kaipu Testing Wins 33.4 Million Yuan New Energy Grid Connection Contract
On September 20, Kaipu Testing (开普检测) announced it has won a bid for a technical consulting services project related to grid connection testing for new energy equipment at the Liangshan Meigu Siji Ji Phase II and Shamanaituo Phase II wind power projects. The company has formally signed a contract with the project owner valued at 33.4 million yuan, which represents 1.35% of Kaipu Testing's 2025 annual revenue. The company stated that signing and fulfilling this contract will help it accumulate further experience in new energy power station grid connection testing projects. However, Kaipu Testing noted that the contract is expected to have a relatively small impact on its 2026 operating performance.
Read sourceKaipu Testing Signs 3.34 Million Yuan Wind Power Grid-Connection Testing Service Contract
On September 20, Kaipu Testing (Kaipu Testing Co., Ltd.) announced the signing of a wind power project grid-connection testing service contract with Sichuan Nengtou Meigu Wind Power Development Co., Ltd. The contract value is 3,340,000 yuan, accounting for 1.35% of the company's audited operating revenue for 2025. The contract period is 184 calendar days, with the specific start date to be determined by the client. The company stated that the signing and performance of this contract will help further accumulate experience in the new energy sector. However, the company also warned that unforeseen or force majeure factors could lead to the contract not being fully performed or being terminated, and the final settlement amount will be based on the project's final completion settlement. The article was generated by AI and does not constitute investment advice. The source is Shanghai Securities News · China Securities Network, published on East Money.
Read sourceKaipu Testing Wins 3.34 Million Yuan Wind Power Grid Testing Contract
Kaipu Testing (003008.SZ) announced on September 20 that it has successfully won a bid for a technical consulting service project related to grid-connected equipment testing for the Liangshan Meigu Siji Ji Phase II and Shamanaituo Phase II wind power projects. The company has formally signed a contract with the project owner, with a total contract value of RMB 3.34 million. The project involves new grid-connected equipment testing for wind power installations. This announcement was made via a stock exchange filing and reported by Stockstar, a Chinese financial news outlet.
Show 2 older updatesHide older updates
Kaipu Testing Wins 33.4 Million Yuan Grid-Connection Testing Contract for Wind Power Projects
Kaipu Testing (003008) announced on September 20 that it has won and formally signed a contract for the technical consulting service project on post-grid-connection equipment testing for the Liangshan Meigu Sijiji Phase II and Shamanaaituo Phase II wind power projects. The contract is valued at 33.4 million yuan, representing 1.35% of the company's operating revenue in fiscal year 2025. The company stated that the signing and performance of this contract will help it further accumulate experience in grid-connection testing projects for new energy power stations, and is expected to have a limited impact on its operating performance in fiscal year 2026.
Read sourceKaipu Testing Wins 3.34 Million Yuan Contract for Wind Power Grid Testing Services
Kaipu Testing (开普检测) announced that it has won a bid and signed a contract for a technical consulting service project related to grid-connection testing of new wind turbines at the Liangshan Meigu Siji Ji Phase II and Shama Naituo Phase II wind power projects. The contract is valued at 3.34 million yuan (approximately $460,000 USD) and has a duration of 184 calendar days. The contract value represents 1.35% of the company's audited operating revenue for the 2025 fiscal year. The company stated that this contract is expected to have a minor impact on its 2026 operating performance.
Read source