TechnologyTracking
Will Louisiana enact statewide data center moratorium by June 30, 2027?
Will Louisiana enact a statewide data center moratorium by June 30, 2027?
Watching: 关注路易斯安那州立法机构或州长在2027年6月30日前是否正式通过或签署全州数据中心暂停令。
Current read
The most likely outcome is "No", with a our assessmentestimate of 91%.
Our assessment
否
是
Evidence context
The evidence shows Maine passed a moratorium and a nationwide anti-data-center wave, but no mention of Louisiana enacting a statewide moratorium. Louisiana hosts a large Meta project, yet the reports do not indicate any such measure there. Thus, these reports do not establish that Louisiana will pass a statewide moratorium by June 30, 2027.
Related facts and sources
Maine passed a moratorium, but the evidence does not mention Louisiana taking similar action.
Nationwide moratoriums and protests exist, but no specific Louisiana policy is mentioned.
Louisiana hosts a large Meta project, but the evidence does not indicate a moratorium there.
Earlier updates
- — Public tracking started; no independent probability estimate yet.; Starting public context: This market will resolve to "Yes" if the State of Louisiana enacts a law or constitutional provision that establishes a statewide moratorium on new data centers between market creation and the specified date, 11:59 PM ET. Otherwise, this market will resolve to "No". A statewide moratorium on new data centers refers to a binding policy with legal force that generally prohibits or suspends the approval, permitting, construction, grid interconnection, or operation of all new data centers, or a subset of data centers that includes all new data centers with an interconnection capacity above 100 MW per facility (requested or nameplate), throughout the state. Suspensions of tax incentives, exemption certifications, or economic development awards alone will not qualify, nor will a moratorium adopted by a local government or limited to part of the state. Specific exemptions (e.g., for specified applications, executed agreements, or interconnection requests) do not prevent a measure from generally applying to all new data centers, or a qualifying subset of new data centers, provided that data center approval, permitting, construction, grid interconnection, or operation is prohibited by default, rather than permitted subject to conditions or restrictions. Conditions on the resumption or termination of a suspension do not make a measure one that permits subject to conditions; a measure that suspends approvals, permitting, construction, or interconnection until a specified condition is satisfied qualifies. Enactment occurs when a bill becomes law under the state's constitution and laws, whether by gubernatorial signature, veto override, becoming law without signature, approval at a statewide referendum election, or any other legal mechanism by which statutes can be enacted. For an initiated or referred statute or constitutional amendment, or other voter referendum, the relevant law is considered to have been enacted on the election day on which it was approved, as reflected in
- — The most likely outcome is "No", with a our assessmentestimate of 91%.; The evidence shows Maine passed a moratorium and a nationwide anti-data-center wave, but no mention of Louisiana enacting a statewide moratorium. Louisiana hosts a large Meta project, yet the reports do not indicate any such measure there. Thus, these reports do not establish that Louisiana will pass a statewide moratorium by June 30, 2027.